中国·永利y23455(股份)有限公司

EPC Roads and Bridges Detection
Roads and Bridges Detection
Dynamic test on railway viaduct
Add Time:2018-11-23 View Count:1317 Resoure:EPC

The aim of the monitoring was to study the constructive typologies and their details subject to fatigue loading

The viaduct has a total length of 322 meters, it is composed by 7 spans, each one of 46 meters


 

Aim of monitoring:
 

The aim of the monitoring was to study the constructive typologies and their details subject to fatigue loading. For this application 8 SOFO sensors with a length of 1 meters were installed to monitor the dynamic response of the bridge when a high speed train across the viaduct
 

INSTALLATION PERIOD TYPE OF SENSORS NUMBER OF SENSORS
2007 SOFO 8

Recommended
XML 地图
XML 地图