中国·永利y23455(股份)有限公司

400-700-9998
永利y23455 Geophysical Engineering
Geophysical Engineering
Luzzone Dam Raising
发布时间:2018-11-23 浏览次数:1088 来源:永利y23455

The Luzzone dam was recently raised by 18 m to increase the capacity of the reservoir.


 

Aim of monitoring:
 

The new concrete was instrumented with long-gage SOFO sensors to monitor its shrinkage deformations and to evaluate the interaction between the newly added concrete and the old one.



 

Main results:
 

The sensors survived unharmed the installation in the coarse concrete. Then sensors monitored the deformations over years of operation and showed results compatible with the finite-element simulations.
 

INSTALLATION PERIOD TYPE OF SENSORS NUMBER OF SENSORS
1997 DiTeSt / DiTemp , SOFO 9

The Luzzone dam during construction

SOFO sensor installation in the coarse concrete

为您推荐
XML 地图
XML 地图