The structure is a pier in Genoa harbor for the docking of large ships. The main structural deck consists of five U-shaped pre-fabricated beams.
Aim of monitoring:
Thanks to the measurements obtained with the SOFO system, it’ll be possible to follow the behaviour of the structure when boats dock at the pier.
INSTALLATION PERIOD | TYPE OF SENSORS | NUMBER OF SENSORS |
2003 | SOFO | 24 |