中国·永利y23455(股份)有限公司

EPC Solutions Geotechnical and Structural Ethiopia pier in Genoa
产品中心
BBS|Hot Topic
Ethiopia pier in Genoa

Model:

Use:

Standard:

Related Products
Product Detail

With a length of approx. 400m and a draft of 9m, the Ethiopia pier is one of the more important pier in Genoa.



 

Aim of monitoring:

The proposed monitoring system was designed in order to allow the control of behavior of dock during the excavation of the seabed and during operation. 




 

Main results:
 

MuST system integrated in a narrow service tunnel inside the pier structure

INSTALLATION PERIOD TYPE OF SENSORS NUMBER OF SENSORS
2005 – 2007 MuST 8

 

 

XML 地图
XML 地图